PEF2256EV22NP Lantiq, PEF2256EV22NP Datasheet - Page 208

PEF2256EV22NP

Manufacturer Part Number
PEF2256EV22NP
Description
Manufacturer
Lantiq
Datasheet

Specifications of PEF2256EV22NP

Number Of Transceivers
1
Screening Level
Industrial
Mounting
Surface Mount
Operating Temperature (min)
-40C
Operating Temperature (max)
85C
Lead Free Status / RoHS Status
Supplier Unconfirmed
Table 52
Register Setting
FMR2.FRS(2:1) = 10
FMR1.AFR = 1
FMR2.ALMF = 1
FMR2.FRS1/0 = 11
Table 53
Register Setting
MODE = 88
MODE2= 88
MODE3= 88
CCR1 = 18
CCR3= 08
CCR4= 08
Data Sheet
H
H
H
H
H
H
Framer Initialization (E1) (cont’d)
HDLC Controller Initialization (E1)
Function
In this mode a search of double framing is automatically
restarted, if no CRC4 multiframing is found within 8ms. Together
with FMR2.AXRA = 1 this mode is essential to meet ETS300
011 and reduces the processor load heavily.
The receiver initiates a new basic- and multiframing research if
more than 914 CRC4 errors have been detected in one second.
In the interworking mode the FALC
format if no multiframe pattern is found in a time interval of
400 ms. This is also indicated by a 400 ms interrupt. Additionally
the extended interworking mode (FMR3.EXTIW = 1) will activate
after 400 ms the remote alarm (FMR2.AXRA = 1) and will still
search the multiframing without switching completely to the
double framing. A complete resynchronization in an 8 ms
interval is not initiated.
Function
HDLC channel 1, 2, and 3receivers active on line side, no
address comparison.
Enable signaling via TS(31:0), interframe time fill with
continuous flags (channel 1).
Interframe time fill with continuous flags (channel 2).
Interframe time fill with continuous flags (channel 3).
208
®
Operational Description E1
56 stays in double framing
Rev. 1.1, 2005-06-13
PEF 2256 H/E
FALC
®
56

Related parts for PEF2256EV22NP