NT600SST121BEV3 Omron, NT600SST121BEV3 Datasheet - Page 82

no-image

NT600SST121BEV3

Manufacturer Part Number
NT600SST121BEV3
Description
LCD Touch Panels
Manufacturer
Omron
Datasheet

Specifications of NT600SST121BEV3

Peak Reflow Compatible (260 C)
No
Leaded Process Compatible
No
Rohs Compliant
No
Lead Free Status / RoHS Status
Lead free / RoHS Compliant
Other names
NT600S-ST121B-EV3
Executing the Validation
Displaying the error log and its location
70
Operating the Application Manager
Reference: S Please execute the validation after the creation of screen data (application).
Reference: S The messages contents of the error log are cleared when an element or a
Reference: Validation will be also performed when saving the screen data in mmi format.
(1) Right after performing the screen validation mentioned above, choose [Vali-
(2) Click the
S Validation performed from the [Tools] menu
S Validation during the data conversion and importing DOS data file
S Validating the current focused screen
S Validating the whole screen data (application) file
S Validation might need a sufficient time period in case the screen data (applica-
If the error check function detects an error, a brief error message is displayed and
you are requested to confirm the “error log.”
The Support Tool provides real time validation while users are creating data.
This function mainly checks the elements one by one. Moreover, maximum
number of elements and memory size will be also watched.
It is also possible to perform the Validation using [Tools]
menu bar.
By the check, Support Tool will detect the contradiction in the screen (applica-
tion) data including association between touch switches and the elements and
so on.
This check will be also performed at the beginning of the download process to
prohibit the wrong data to be downloaded.
Validation will be also performed when converting the screen data (application)
from a current model to another model and when importing the DOS data file.
Data conversion will be also performed when the registered symbol data from
the Symbol Manager that was created by a certain PT model, has been
dragged and dropped to the another PT model screen. So at this time valida-
tion will be also performed.
Make sure the screen you want to validate is open, and select [Validate] from
the [Tools] menu.
tion) itself has large size and validation for the whole data has been executed.
So when “Validating for the whole data” has been performed, the confirmation
dialog box appears asking whether you want to perform the validation or not.
Click the
screen is operated. Therefore, if an error is detected, display the error log win-
dow immediately to determine the details of the error. Since errors occurring
during data conversion, in particular, may not reoccur if you try to check them
later, they must be checked at their occurrence.
date] from the [Tools] menu again. Confirmation dialog box arrives.
During the validation, it is not possible to perform other operation.
After the validation has been completed the result message arrives.
Button to start the validation.
Button. Then the validation will start.
[Validate]
[Validate] from the
Section
4-2

Related parts for NT600SST121BEV3