CRT1-OD16SL-1 Omron, CRT1-OD16SL-1 Datasheet - Page 596

no-image

CRT1-OD16SL-1

Manufacturer Part Number
CRT1-OD16SL-1
Description
16 Out PNP Cage Clamp
Manufacturer
Omron
Datasheet

Specifications of CRT1-OD16SL-1

Lead Free Status / Rohs Status
Lead free / RoHS Compliant
Temperature Input Unit Functions
Stabilization Times
required in Each Step
572
Input Unit’s power supply ON
Wiring for input 0 adjustment
Input 0 upper/lower limit adjustment
Input 0 bias compensation
Change wiring for input 1 adjustment
Input 1 upper/lower limit adjustment
Input 3 bias compensation
(End of adjustment)
Input 1 bias compensation
Change wiring for input 2 adjustment
Input 2 upper/lower limit adjustment
Input 2 bias compensation
Change wiring for input 3 adjustment
Input 3 upper/lower limit adjustment
Note
Step
The following diagram shows the stabilization times (waiting times) required
when adjusting all 4 inputs.
(1) The terminal block temperature stabilization time does not affect the up-
(2) To perform the adjustment procedure properly, always allow sufficient
per/lower limit adjustment after changing the wiring for input 1, so the ad-
justment can be performed immediately if 30 minutes have passed since
the Temperature Input Unit's power was turned ON.
time for the temperature to stabilize. Also allow sufficient time for devices
such as the STV, DMM, and ZERO-CON to stabilize. Refer to each de-
vice's operating manual for details.
40 minutes
10 minutes
40 minutes
40 minutes
Wait at least 30 minutes.
(Check whether additional
time is required for devices
such as the STV, DMM,
and ZERO-CON.)
Timing chart
Temperature
Input Terminal’s
stabilization time
Terminal Block temperature
stabilization time 4 after wiring
is changed
Terminal Block temperature
stabilization time 3 after wiring
is changed
Terminal Block temperature
stabilization time 1 after wiring
Terminal Block temperature
stabilization time 2 after wiring
is changed
Stabilization time
Section 11-6

Related parts for CRT1-OD16SL-1