W9751G6KB WINBOND [Winbond], W9751G6KB Datasheet - Page 52

no-image

W9751G6KB

Manufacturer Part Number
W9751G6KB
Description
8M ? 4 BANKS ? 16 BIT DDR2 SDRAM
Manufacturer
WINBOND [Winbond]
Datasheet

Available stocks

Company
Part Number
Manufacturer
Quantity
Price
Part Number:
W9751G6KB-18
Manufacturer:
WINBOND
Quantity:
7 600
Part Number:
W9751G6KB-18
Manufacturer:
Winbond
Quantity:
9 680
Company:
Part Number:
W9751G6KB-18
Quantity:
245
Company:
Part Number:
W9751G6KB-18
Quantity:
20 000
Part Number:
W9751G6KB-25
Manufacturer:
ISSI
Quantity:
3 140
Part Number:
W9751G6KB-25
Manufacturer:
Winbond Electronics
Quantity:
10 000
Part Number:
W9751G6KB-25
Manufacturer:
WINBOND/华邦
Quantity:
20 000
Company:
Part Number:
W9751G6KB-25
Quantity:
98
Company:
Part Number:
W9751G6KB-25
Quantity:
20
Company:
Part Number:
W9751G6KB-25
Quantity:
203
- tJIT(duty)
- tJIT(per), tJIT(per,lck)
- tJIT(cc), tJIT(cc,lck)
- tERR(2per), tERR (3per), tERR (4per), tERR (5per), tERR (6-10per) and tERR (11-50per)
tJIT(duty) is defined as the cumulative set of tCH jitter and tCL jitter. tCH jitter is the largest deviation of any single tCH from
tCH(avg). tCL jitter is the largest deviation of any single tCL from tCL(avg).
tJIT(duty) = Min/max of {tJIT(CH), tJIT(CL)}
where,
tJIT(CH) = {tCHi- tCH(avg) where i=1 to 200}
tJIT(CL) = {tCLi- tCL(avg) where i=1 to 200}
tJIT(per) is defined as the largest deviation of any single tCK from tCK(avg).
tJIT(per) = Min/max of {tCKi- tCK(avg) where i=1 to 200}
tJIT(per) defines the single period jitter when the DLL is already locked.
tJIT(per,lck) uses the same definition for single period jitter, during the DLL locking period only.
tJIT(per) and tJIT(per,lck) are not guaranteed through final production testing.
tJIT(cc) is defined as the difference in clock period between two consecutive clock cycles:
tJIT(cc) = Max of |tCKi+1 – tCKi|
tJIT(cc) defines the cycle to cycle jitter when the DLL is already locked.
tJIT(cc,lck) uses the same definition for cycle to cycle jitter, during the DLL locking period only.
tJIT(cc) and tJIT(cc,lck) are not guaranteed through final production testing.
tERR is defined as the cumulative error across multiple consecutive cycles from tCK(avg).
Where
tERR(nper) =
11
6
n
n
n
n
n
n
=
=
=
=
2
3
4
5
50
i
10
j
n
1
1
tCK
- 52 -
for
for
for
for
for
for
j
tER
tER
tER
–n × tCK(avg)
tER
tER
tER
R(3per)
R(11
R(5per)
R(2per)
R(4per)
R(6
Publication Release Date: Dec. 09, 2011
10per)
50per)
W9751G6KB
Revision A01

Related parts for W9751G6KB