CJ1W-EIP21 Omron, CJ1W-EIP21 Datasheet - Page 230
CJ1W-EIP21
Manufacturer Part Number
CJ1W-EIP21
Description
Ethernet I/P Module
Manufacturer
Omron
Datasheet
1.CJ1W-EIP21.pdf
(469 pages)
Specifications of CJ1W-EIP21
Lead Free Status / Rohs Status
Lead free / RoHS Compliant
- Current page: 230 of 469
- Download datasheet (10Mb)
FINS/TCP Method
8-3
8-3-1
FINS/TCP Features
202
FINS/TCP Method
Overview
The FINS/TCP method is a FINS communications method that uses the TCP/
IP protocol. TCP/IP is a connection-type communications protocol. Before a
message is sent from one node to another, it is necessary to establish a vir-
tual circuit, i.e., a connection. Once a connection has been established, com-
munications are quite reliable. The arrival of data that is sent via the
connection is confirmed by an acknowledgement (ACK) response, and retries
are executed automatically as required.
When FINS/TCP is used, it must be determined which node is the server and
which nodes are the clients.
For communications between a personal computer and a PLC, the computer
should normally be set as the client and the PLC as the server. For communi-
cations between two PLCs, either one can be set as the client and the other
as the server.
Compared to the FINS/UDP method, the FINS/TCP method has the following
characteristics.
• Data transmission is more reliable, due to factors such as retry process-
• Remote clients can be restricted by means of settings at the server (i.e.,
• Broadcasting cannot be used.
• TCP/IP has various retry procedures, and this tends to lower its perfor-
• There is a limit to the number of connections that can be made (i.e., 16
ing at the TCP/IP layer. The FINS/TCP method is thus better suited to
dealing with communications errors in an IP network that spans several
layers.
the server can be protected from access by non-specified IP addresses).
mance in comparison with UDP/IP.
connections maximum), and any given node can communicate only with
up to 16 other nodes at a time.
(Client)
Node
An acknowledgement is received whenever a
connection is established or data is sent, so
transmissions are more reliable but somewhat slower.
Notification of establishing
connection
Request to establish a connection
Acknowledgement
Data transmission 1
Acknowledgement
(Server)
Node
Connection
established
Section 8-3
Related parts for CJ1W-EIP21
Image
Part Number
Description
Manufacturer
Datasheet
Request
R
Part Number:
Description:
High Speed Pulse Train 2 Axes
Manufacturer:
Omron
Datasheet:
Part Number:
Description:
High Speed Pulse Train 2 Axes
Manufacturer:
Omron
Datasheet:
Part Number:
Description:
High Speed Pulse Train 4 Axes
Manufacturer:
Omron
Datasheet:
Part Number:
Description:
HIGH SPEED COUNTER 500Khz 2 CH
Manufacturer:
Omron
Datasheet:
Part Number:
Description:
G6S-2GLow Signal Relay
Manufacturer:
Omron Corporation
Datasheet:
Part Number:
Description:
Compact, Low-cost, SSR Switching 5 to 20 A
Manufacturer:
Omron Corporation
Datasheet:
Part Number:
Description:
Manufacturer:
Omron Corporation
Datasheet:
Part Number:
Description:
Manufacturer:
Omron Corporation
Datasheet:
Part Number:
Description:
Manufacturer:
Omron Corporation
Datasheet:
Part Number:
Description:
Manufacturer:
Omron Corporation
Datasheet: