V020-E3-2 Omron, V020-E3-2 Datasheet - Page 44

no-image

V020-E3-2

Manufacturer Part Number
V020-E3-2
Description
Publications, Books
Manufacturer
Omron
Datasheet

Specifications of V020-E3-2

Lead Free Status / RoHS Status
na
2-2-2
28
Installation
Installation to the Operation Panel
Caution:
Note:
Note:
The NT20S can be flush mounted to an operation panel.
Use the panel fittings and tools included in the product package and follow the pro-
cedure below.
During work at the panel, take care to ensure that no metal scraps enter the unit.
Otherwise, the product may malfunction.
The thickness of applicable operation panel is 1.6 mm to 4.8 mm. All fittings must
be tightened uniformly to a torque of at least 0.5 to 0.6 N·cm in order to ensure
water- and dust-resistance. The panel must not be soiled or warped, and must be
able to support an installation that will remain secure and strong.
(1) Open a hole, shown below, in the panel and install the NT20S from the front
(2) Attach the panel fittings at four positions, shown below, on the rear side of the
In order to ensure adequate water and dustproof performance, tighten the four
panel fittings uniformly and make sure there are no gaps between the fittings and
the NT20S panel.
side of the panel.
NT20S.
Fit the hook of the fitting in the square hole in the body and tighten the screw
with a Phillips head screwdriver while lightly pulling the fitting.
178.5
+0.5 mm
0 mm
100.5
+0.5 mm
0 mm
Section 2-2

Related parts for V020-E3-2