XW2Z-100J-B9 Omron, XW2Z-100J-B9 Datasheet - Page 76

no-image

XW2Z-100J-B9

Manufacturer Part Number
XW2Z-100J-B9
Description
SERVO DRV+G8R CONNECTING CABLES
Manufacturer
Omron
Datasheet

Specifications of XW2Z-100J-B9

Lead Free Status / Rohs Status
Lead free / RoHS Compliant
Other names
XW2Z100JB9
3-1-2
Wiring Duct Example
Installation
Installation in a Control Panel
AC10 0
INPU T
-240V
L2/N
Note
Note
NC
NC
L1
The FQM1 must be mounted inside a control panel on DIN Track.
The FQM1 must be mounted on DIN Track. It cannot be mounted with screws.
Wiring Ducts
Use wiring ducts to wire the FQM1’s built-in I/O. Install the wiring ducts to
facilitate wiring the built-in I/O. It is handy to have the duct at the same height
as the FQM1.
The following example shows the proper installation of wiring ducts.
Tighten terminal block screws and cable screws to the following torques.
Terminal Screws
30 mm
M4: 1.2 N·m
M3: 0.5 N·m
Unit
Duct
Duct
40 mm
20 mm min.
20 mm min.
DIN Track
30 mm
Duct
80.0 mm
FQM1
PLC
Mounting
bracket
Section 3-1
53