PEB 24911 H V1.3 Lantiq, PEB 24911 H V1.3 Datasheet - Page 33

no-image

PEB 24911 H V1.3

Manufacturer Part Number
PEB 24911 H V1.3
Description
Manufacturer
Lantiq
Datasheet

Specifications of PEB 24911 H V1.3

Lead Free Status / Rohs Status
Supplier Unconfirmed
Figure 10
3.2.2
The start of a new superframe is programmed by a FSC high-phase lasting for one single
DCL-period. A FSC high-phase of two (or more) DCL-periods is transmitted for all other
IOM
It is optional to include superframe markers in every 96th “frame synchronization” signal.
The remaining 95 FSC-clocks must be of at least two DCL-periods duration. If no
superframe marker is to be used all FSC high-phases need to be of at least two DCL-
periods duration.
With the SF function enabled the next outgoing basic frame on U defines the start of the
U superframe by an inverted sync word (see
IOM
1.5 ms.
Data Sheet
®
®
-2-frame starts.
-2 and the U superframe are no more arbitrary but definite within a tolerance of
Superframe Marker Function
Multiplexed Frame Structure of the IOM
23
Figure
11). This way the positions of the
®
-2 Interface
Functional Description
PEF 24911
2001-07-16

Related parts for PEB 24911 H V1.3