CRT1-ID08SL Omron, CRT1-ID08SL Datasheet - Page 553

no-image

CRT1-ID08SL

Manufacturer Part Number
CRT1-ID08SL
Description
8 In NPN Cage Clamp
Manufacturer
Omron
Datasheet

Specifications of CRT1-ID08SL

Lead Free Status / Rohs Status
Lead free / RoHS Compliant
11-4-11 Last Maintenance Date
Description
Setting Using the CX-Integrator
Analog I/O Slave Unit (input) Functions
1,2,3...
1,2,3...
■ Setting the Last Maintenance Date of the Unit
■ Setting the Last Maintenance Date of the Connected Device
Writes the maintenance date to the unit, individually to units and connected
devices. It enables the user to easily determine the next maintenance date.
The date can be set using the CX-Integrator.
1. Turn ON the power supply to the CompoNet Slave Unit.
2. Double-click the icon of the Slave Unit to set in the Network Configuration
3. Click the General Tab and select a date from the Last Maintenance Date
4. Click the Transfer [PC to Unit] Button to download the data, and then click
5. Click the OK Button and exit the window.
1. Turn ON the power supply to the CompoNet Slave Unit.
2. Double-click the icon of the Slave Unit to set in the Network Configuration
3. Click the Tab Page for the input that is connected to a device requiring the
Window to open the Configuration Window. (Alternatively, right-click the
icon and select Parameters - Edit from the pop-up menu.)
Field. (To enter the current date, select Today from the bottom of the pull-
down menu.)
the Reset Button to reset the Unit.
Window to open the Configuration Window. (Alternatively, right-click the
icon and select Parameters - Edit from the pop-up menu.)
last maintenance date to be set. Select the applicable date from the pull-
down menu in the Last Maintenance Date Field. (To enter the current date,
select Today, which is at the bottom of the pull-down menu.)
Section 11-4
529

Related parts for CRT1-ID08SL