NCP1015ST100T3G ON Semiconductor, NCP1015ST100T3G Datasheet - Page 13

IC OFFLINE SWIT SMPS CM SOT223

NCP1015ST100T3G

Manufacturer Part Number
NCP1015ST100T3G
Description
IC OFFLINE SWIT SMPS CM SOT223
Manufacturer
ON Semiconductor
Datasheet

Specifications of NCP1015ST100T3G

Output Isolation
Isolated
Frequency Range
90 ~ 110kHz
Voltage - Input
8.5 ~ 10 V
Voltage - Output
700V
Power (watts)
19W
Operating Temperature
0°C ~ 150°C
Package / Case
TO-261-4, TO-261AA, SOT-223-4
Duty Cycle (max)
72 %
Mounting Style
SMD/SMT
Switching Frequency
1000 KHz
Operating Supply Voltage
- 0.3 V to + 10 V
Maximum Operating Temperature
+ 150 C
Minimum Operating Temperature
- 60 C
Operating Temperature (max)
150C
Pin Count
3 +Tab
Mounting
Surface Mount
Package Type
SOT-223
Case Length
6.5mm
Case Height
1.57mm
Lead Free Status / RoHS Status
Lead free / RoHS Compliant

Available stocks

Company
Part Number
Manufacturer
Quantity
Price
Part Number:
NCP1015ST100T3G
Manufacturer:
ON/安森美
Quantity:
20 000
Part Number:
NCP1015ST100T3G
0
Company:
Part Number:
NCP1015ST100T3G
Quantity:
3 380
Company:
Part Number:
NCP1015ST100T3G
Quantity:
3 380
Soft−Start
activated during the power on sequence (P
V
increased from nearly zero up to the maximum internal
clamping level (e.g. 350 mA). This situation lasts 1 ms and
further to that time period, the peak current limit is blocked
to the maximum until the supply enters regulation. The
Non−latching Shutdown
temporarily and authorize its re−start once the default has
disappeared. This option can easily be accomplished
through a single NPN bipolar transistor wired between FB
Full Latching Shutdown
when an abnormal situation is detected (over temp or
overvoltage). This feature can easily be implemented
through two external transistors wired as a discrete SCR.
CC
The NCP1015 features an internal 1 ms soft−start
In some cases, it might be desirable to shut off the part
Other applications require a full latching shutdown, e.g.
reaches V
Figure 22. A Non−latching Shutdown where Pulses are Stopped as long as the NPN is Biased
Figure 21. Soft−Start is Activated During a Start−up Sequence or an OCP Condition
CC(off)
ON/OFF
0 V (Fresh PON)
4.7 V (Overload)
V
Current
, the peak current is gradually
CC
Sense
or
ON
). As soon as
http://onsemi.com
13
8.5 V
soft−start is also activated during the over current burst
(OCP) sequence. Every re−start attempt is followed by a
soft−start activation. Generally speaking, the soft−start will
be activated when V
power−on sequence) or 4.5 V, the latch−off voltage
occurring during OCP. Figure 21 shows the soft−start
behavior. The time scales are purposely shifted to offer a
better zoom portion.
1.0 ms
and ground. By pulling FB below the internal skip level
(V
relaxed, the IC resumes its operation. Figure 22 shows the
application example:
When the OVP level exceeds the zener breakdown voltage,
the NPN biases the PNP and fires the equivalent SCR,
permanently bringing down the FB pin. The switching
pulses are disabled until the user un−plugs the power supply.
skip
Max Ip
), the output pulses are disabled. As soon as FB is
+
CV
CC
1
2
3
4
CC
ramps up either from zero (fresh
8
7
5
Transformer

Related parts for NCP1015ST100T3G