PLD-12 Panduit Corp, PLD-12 Datasheet - Page 101

no-image

PLD-12

Manufacturer Part Number
PLD-12
Description
Pre-printed Marker Labels
Manufacturer
Panduit Corp
Series
PAN-CODE™r
Type
Labelr
Datasheet

Specifications of PLD-12

Label Type
CIRCUIT NO., LOCATION
Label Size
1.500" x 1.000" (38.10mm x 25.40mm)
Color
Orange Legend, White Background
Lead Free Status / RoHS Status
Lead free / RoHS Compliant
For Use With/related Products
Warning
Lead Free Status / RoHS Status
Lead free / RoHS Compliant
For service and technical support, call 800-777-3300 or visit www.panduit.com.
1910.147(c)(7)(iii)
Employee retraining.
..1910.147(c)(7)(iii)(A)
1910.147(c)(7)(iii)(A)
Retraining shall be provided for all authorized and affected employees
whenever there is a change in their job assignments, a change in machines,
equipment or processes that present a new hazard, or when there is a
change in the energy control procedures.
1910.147(c)(7)(iii)(B)
Additional retraining shall also be conducted whenever a periodic inspection
under paragraph (c)(6) of this section reveals, or whenever the employer has
reason to believe that there are deviations from or inadequacies in the
employee's knowledge or use of the energy control procedures.
1910.147(c)(7)(iii)(C)
The retraining shall reestablish employee proficiency and introduce new or
revised control methods and procedures, as necessary.
1910.147(c)(7)(iv)
The employer shall certify that employee training has been accomplished
and is being kept up to date. The certification shall contain each employee's
name and dates of training.
1910.147(c)(8)
Energy isolation. Lockout or tagout shall be performed only by the
authorized employees who are performing the servicing or maintenance.
1910.147(c)(9)
Notification of employees. Affected employees shall be notified by the
employer or authorized employee of the application and removal of lockout
devices or tagout devices.
Notification shall be given before the controls are applied, and after they are
removed from the machine or equipment.
..1910.147(d)
1910.147(d)
Application of control. The established procedures for the application of
energy control (the lockout or tagout procedures) shall cover the following
elements and actions and shall be done in the following sequence:
1910.147(d)(1)
Preparation for shutdown. Before an authorized or affected employee
turns off a machine or equipment, the authorized employee shall have
knowledge of the type and magnitude of the energy, the hazards of the
energy to be controlled, and the method or means to control the energy.
1910.147(d)(2)
Machine or equipment shutdown. The machine or equipment shall be
turned off or shut down using the procedures established for the machine
or equipment. An orderly shutdown must be utilized to avoid any additional
or increased hazard(s) to employees as a result of the equipment stoppage.
OSHA Standard 29CFR
The Control of Hazardous Energy
(Lockout/Tagout) 1910.147 (continued)
H9

Related parts for PLD-12