SU2200XLNET APC, SU2200XLNET Datasheet - Page 14

no-image

SU2200XLNET

Manufacturer Part Number
SU2200XLNET
Description
UPS - Uninterruptible Power Supplies APC Smart-UPS XL 2200VA 120V
Manufacturer
APC
Datasheet

Specifications of SU2200XLNET

Power Rating
1600 W
Output Voltage Rating
120 V
Number Of Outlets
8
Interface Port
DB-9 RS-232, SmartSlot
Topology
Online
Tower / Rackmount
Tower
Lead Free Status / Rohs Status
Lead free / RoHS Compliant
Plug the loads into the output connectors on the rear of the unit. To use the unit as a master on/
off switch, make sure that all of the loads are switched on.
Caution: Do not connect a laser printer to the unit along with other computer equipment unless
the unit is rated 1400 VA or higher. A laser printer periodically draws significantly more power
than when idle, and may overload the unit. Verify that the unit can support the loads when the
printer is in full operation (printing).
Test the system with all loads operating to make sure that the unit is not overloaded. See section
6.2.
After plugging in the loads and the unit, check the site wiring fault indicator on the rear panel. See
section 3.2 for the location of the indicator on the back panel. It lights if the unit is plugged into an
improperly wired AC power outlet. Wiring faults detected include missing ground, hot-neutral po-
larity reversal, and overloaded neutral circuit.
Caution: If the unit indicates a site wiring fault, get a qualified electrician to correct the building wir-
ing.
The unit features a TVSS connector for connecting the ground lead on transient voltage surge-sup-
pression (TVSS) devices such as telephone and network line protectors. The TVSS connector pro-
vides grounding through the unit’s power cord ground conductor.
Note: Do not use the TVSS connector if the site wiring fault indicator is lit.
To make a connection to the TVSS connector, loosen the screw and connect the surge suppression
device’s ground lead. See section 3.2 for the location of the connector. Tighten the screw to secure the
lead.
10
4.7 Connect the Loads
4.8 Check the Site Wiring Fault Indicator
4.9 Connect Ground Leads to TVSS Connector (Optional)

Related parts for SU2200XLNET