E53-COV07 Omron, E53-COV07 Datasheet - Page 13

no-image

E53-COV07

Manufacturer Part Number
E53-COV07
Description
TERMINAL COVER E5CK
Manufacturer
Omron
Datasheets

Specifications of E53-COV07

Accessory Type
Terminal Cover
Lead Free Status / RoHS Status
Lead free / RoHS Compliant
For Use With/related Products
E5CK
Lead Free Status / Rohs Status
Lead free / RoHS Compliant
Other names
E53COV07
E5EK
1. Remove the Power Board in the order shown in the following
E5CK
1. Two rectangular holes are provided on the Power Board
2. With the output board fitted into the Power Board, fit the
diagram.
(right side of Controller). Fit the two protrusions of the
output board into these two holes.
output board into the connector on the control board (left
side of Controller).
2
Power
board
1
2. Insert the Option Board into the socket for option 1. The
3. Mount the option boards and the power board in the order
Set up the Option Board
1. Place the bottom of the Controller facing up, fit the board
2. With the Power Board connected, fit the board vertically
horizontally into the connector on the power board (right
side of controller).
into the connector on the control board (left side of
Controller).
following diagram shows the relationship between the
Option Board and mounting position.
shown.
Digital Process Controller
2
E5 K
1
13

Related parts for E53-COV07