7-1926733-7 TE Connectivity, 7-1926733-7 Datasheet
![](/photos/41/38/413898/pr1926733_sml.jpg)
7-1926733-7
Specifications of 7-1926733-7
Related parts for 7-1926733-7
7-1926733-7 Summary of contents
Page 1
... All inspections shall be perform ed using the applicable inspection plan and product drawing. 1.3. Successful qualification testing on the subject product line was com pleted on 20Apr09. The Qualification Test Report num ber for this testing is 501-703. This docum entation is on file at and available from Engineering Practices and Standards (EPS). 2. ...
Page 2
... Circuit carried on 4 commoned 2 ounce layers. Further current testing results are available in 502-1259. A test system consists of 24 power contacts on 2.75 mm contact pitch and 40 signal contacts on 2.0 mm contact pitch. ...
Page 3
... DC inute hold for power contacts. Test between adjacent contacts of m ated specim ens. EIA-364-20, Condition I. 750 volts DC at sea level for signal contacts. 2500 volts DC for power contacts. Test between adjacent contacts of m ated specim ens and between closest signal and power contacts ...
Page 4
... Tyco Electronics 109-41. Measure force necessary to correctly apply a specim PCB axim um rate of 12 per m inute. Tyco Electronics 109-30-1. Measure force necessary to rem ove a correctly applied specim en from its PCB axim um rate of 12 per m inute ...
Page 5
... Minute disturbance. Com ponent heat resistance to wave soldering. Therm al shock. Hum idity/tem perature cycling. Rev B Requirem ent F1 = 100 displacem ent of connector on PCB likely to im pair norm al operation. See Note. Signal contacts inim um in the m ating direction. ...
Page 6
... Requirem ent See Note. See Note. See Note. Figure 3 (end) 108-2325 Procedure EIA-364-17, Method A, Test Condition 3, Test Tim e Condition C. Subject m ated specim ens for 500 hours. EIA-364-65, Class IIA (4 gas). Subject specim ens to environm ental Class IIA for 20 days (10 days unm ated followed by 10 days m ated) ...
Page 7
... Power only in housing, signal only in housing, and signal and power in housing. (h) Measure LLCR after 10 days unmated exposure. Rev B Test Group ( 6(b) 7(c) Test Sequence ( 2,4,6 3,7 2,4 2,4,6,8 10 2,6 3,7 3(f), 2(g) 8( 3(f)( Figure 4 108-2325 2,4 3( ...
Page 8
... Test Group 5 shall consist ated plugs and receptacles. Test Groups 6 and 11 shall each consist of 5 plugs. Test Groups 7 and 9 shall each consist of 5 receptacles. B. ...
Page 9
Rev B Figure 5 Static Load 108-2325 ...