GCN1-100 Omron, GCN1-100 Datasheet - Page 88

no-image

GCN1-100

Manufacturer Part Number
GCN1-100
Description
CABLE MULTI I/O 1M
Manufacturer
Omron
Datasheet

Specifications of GCN1-100

Lead Free Status / Rohs Status
Lead free / RoHS Compliant
Other names
GCN1100
Wiring Methods
1,2,3...
Note
1. Cut the cable.
2. Attach the cable.
3. Pressure-weld the connector.
1. Do not pressure-weld the connector cover at the edges.
2. Do not pressure-weld the connector cover at the back of the pressure-
3. Set the connector in the correct orientation.
Cut the cable perpendicular to the length.
To prevent short-circuits, cut the cable with a sharp tool, such as wire cut-
ters, and make sure that no whiskers are left on the wires.
Align the indications on the cable identification label with the cable colors
and insert the cable. The cover is translucent, so it is possible to confirm
that the cable has been inserted all the way in.
Use the DWT-A01 Pliers to pressure-weld the connectors.
1) As shown in the following diagram, align the center of the connector cov-
2) Squeeze firmly on the Pliers until the lock on the connector clicks into
welding block.
er (see arrows) with the center of the pressure-welding block on the Pli-
ers.
place.
Pliers
OK
NG
Confirm that the cable has been
inserted up to this position.
Connector cover
NG
NG
Section 2-4
67