DP-190 (Translucent) 3M, DP-190 (Translucent) Datasheet - Page 5

no-image

DP-190 (Translucent)

Manufacturer Part Number
DP-190 (Translucent)
Description
Chemicals 1.7 OZ 2 PART EPOXY TRANSLUCENT
Manufacturer
3M
Datasheet

Specifications of DP-190 (Translucent)

Product
Adhesives
Other names
02120087219 62328614359 DP-190
3M
Epoxy Adhesives
DP190 Translucent and Gray
Handling/Curing
Information
3M™ EPX™
Pneumatic Applicator
Delivery Rates
Scotch-Weld
Directions For Use
1. For high strength structural bonds, paints, oxide films, oils, dust, mold release agents
2. Mixing
3. For maximum bond strength, apply adhesive evenly to both surfaces to be joined.
4. Application to the substrates should be made within 75 minutes. Larger quantities and/or
5. Join the adhesive coated surfaces and allow to cure at 60°F (16°C) or above until
6. Keep parts from moving during cure. Contact pressure necessary. Maximum shear strength
7. Excess uncured adhesive can be cleaned up with ketone type solvents.*
*Note: When using solvents, extinguish all ignition sources, including pilot lights, and follow
Adhesive Coverage (typical): A 0.005 in. thick bondline will yield a coverage of
200 ml Applicator – Maximum Pressure 58 psi
50 ml Applicator – Maximum Pressure 50 psi
*Tests were run at a temperature of 70°F ± 2°F (21°C ± 1°C) and at maximum applicator pressure.
Adhesive*
3M™ Scotch-Weld™ Epoxy Adhesive DP190 Gray
Adhesive*
3M™ Scotch-Weld™ Epoxy Adhesive
DP190 Translucent
Scotch-Weld epoxy adhesive DP190 Gray
Scotch-Weld epoxy adhesive DP190 Gray
Scotch-Weld epoxy adhesive DP190 100°F (38°C)
and all other surface contaminants must be completely removed. However, the amount
of surface preparation necessary directly depends on the required bond strength and the
environmental aging resistance desired by the user. For suggested surface preparations
on common substrates, see the section on surface preparation.
For Duo Pak Cartridges
3M™ Scotch-Weld™ Epoxy Adhesives DP190 Translucent and DP190 Gray are supplied
in a dual syringe plastic duo-pak cartridge as part of the 3M™ EPX™ Applicator system.
To use, simply insert the duo-pak cartridge into the EPX applicator and start the plunger
into the cylinders using light pressure on the trigger. Next, remove the duo-pak cartridge
cap and expel a small amount of adhesive to be sure both sides of the duo-pak cartridge are
flowing evenly and freely. If automatic mixing of Part A and Part B is desired, attach the
EPX applicator mixing nozzle to the duo-pak cartridge and begin dispensing the adhesive.
For hand mixing, expel the desired amount of adhesive and mix thoroughly. Mix
approximately 15 seconds after uniform color is obtained.
For Bulk Containers
Mix thoroughly by weight or volume in the proportions specified in the typical uncured
properties section. Mix approximately 15 seconds after uniform color is obtained.
higher temperatures will reduce this working time.
completely firm. Heat up to 200°F (93°C) will speed curing. These products will cure in
7 to 14 days @ 75°F (24°C).
is obtained with a 3-5 mil bond line.
manufacturer’s precautions and directions for use.
- 5 -
320 sq. ft./gallon.
6mm Nozzle
gms/minute
112
16.9
21.5 (nozzle cut back 2 divisions)
41.1
11.9
1/4 in. Nozzle
gms/minute
10mm Nozzle
gms/minute
46.0