101BS-N5 Edwards Signaling & Security Systems, 101BS-N5 Datasheet

no-image

101BS-N5

Manufacturer Part Number
101BS-N5
Description
BASE UNIT, ADAPTALIGHT STACKABLE BEACON, COMES WITH HORN
Manufacturer
Edwards Signaling & Security Systems
Datasheet

Specifications of 101BS-N5

Brand/series
101 Series
Color, Lens
Blue
Current, Leakage, Off-state
25 mA
Current, Rating
50 mA
Current, Surge
2 A
Frequency, Operating
50⁄60 Hz
Material, Lens
Polycarbonate
Mounting Type
Surface Mount
Output, Sound
85 dB @ 10’
Voltage, Rating
120 VAC
P-047550-1297 ISSUE 6
2. Route incoming field wiring into the base through the conduit
b.
c.
d. Conduit Mounting (indoor or outdoor installation)
entrance hole.
Up to five high-intensity strobe modules, and/or flashing
halogen or LED modules, and/or steady-on halogen or LED
modules can be used in any position in the stack. The terminal
block labels, 1 through 5, correspond to the stacked modules
with 1 being the bottom module on the stack.
Connect field wiring to the terminal block as shown in Figure
4.
Ground the AC AdaptaLights to the grounding screw (Figure
3) in accordance with applicable codes. Place the connected
wires inside of the base.
Assemble the base unit and place the base gasket on top as
shown in Figure 2.
Direct Surface Mounting (indoor installation only)
Remove the two knockouts from the bottom of the base.
Fasten the base to the surface using suitable hardware
(not supplied).
4" (102 mm) Octagon Box Mounting (indoor installation
only)
Remove the two knockouts from the bottom of the base.
Fasten the base to the octagon box (not supplied) by
installing the screws (supplied with the box) through the
knockout holes in the base.
Install a 1/2" (13 mm) NPT conduit (not supplied). Align
the conduit entrance hole on the base with the conduit
and rotate base until base is tightly secured.
Cat. No.
101BS-G1
101BS-N5
101SINH( )-G1
101SINH( )-N5
101SLED( )-G1
101SLED( )-N5
101FINH( )-G1
101FINH( )-N5
101FLED( )-G1
101FLED( )-N5
101ST( )-G1
101ST( )-N5
*All AC volts at 60 Hz
**Amps/milliseconds
Operating
120V AC
120V AC
120V AC
120V AC
120V AC
120V AC
voltage*
24V DC
24V DC
24V DC
24V DC
24V DC
24V DC
leakage current (mA)
Maximum off state
Table 1. PLC Compatibility
1.5
25
25
25
25
25
25
4
5
4
5
5
3. To stack the modules, align the notch on the bottom of the
NOTE: Never try to remove the through-bolt from the module.
4. Turn on power and verify that module(s) and horn are
Maintenance
Refer to "Specifications" for replacement parts.
1. Remove the 3/8" (9.5 mm) cap screw, o-ring and cap from
2. Remove the #8-32 x 3/8" (9.5 mm) plastic panhead screw
To prevent electrical shock, disconnect all power
and wait 5 minutes for stored energy in strobe
modules to dissipate before starting work on unit.
first module with the notch on the base and press into position.
Secure by tightening the slotted panhead through-bolt located
on the top of the module.
Install the #8-32 x 3/8" (9.5 mm) plastic panhead screw in
the side of the module lens (Figure 5).
Place gasket supplied with module onto the top of the module.
Continue adding modules in this manner as required.
Place the cap supplied with the base unit onto the top module
ensuring the gasket is in place. Secure with an o-ring and 3/
8" (9.5 mm) cap screw (supplied).
operating properly.
top of unit.
from the side of the module lens.
Continuous on
current (mA)
320
110
320
110
300
120
50
50
65
25
65
25
WARNING
Surge (inrush/duration)
(A/ms**)
1.2/100
0.36/1
0.07/1
0.09/8
1.15/8
0.07/1
0.09/8
0.33/1
0.5/8
2.1/1
2/1
2/1

Related parts for 101BS-N5

101BS-N5 Summary of contents

Page 1

... Operating Cat. No. voltage* 101BS-G1 24V DC 101BS-N5 120V AC 101SINH( )-G1 24V DC 101SINH( )-N5 120V AC 101SLED( )-G1 24V DC 101SLED( )-N5 120V AC 101FINH( )-G1 24V DC 101FINH( )-N5 120V AC 101FLED( )-G1 24V DC 101FLED( )-N5 120V AC 101ST( )-G1 24V DC 101ST( )-N5 120V AC *All AC volts **Amps/milliseconds b. Direct Surface Mounting (indoor installation only) Remove the two knockouts from the bottom of the base. ...

Page 2

Loosen the slotted panhead through-bolt (on top module). Do not remove the through-bolt from the module; turn the bolt approximately 30 turns. 4. Carefully remove the module and gasket. 5. Continue to disassemble until the component to be replaced ...

Related keywords