TISP4350L3BJR Bourns Inc., TISP4350L3BJR Datasheet - Page 8

SURGE SUPP 275V BIDIR DO-214AA

TISP4350L3BJR

Manufacturer Part Number
TISP4350L3BJR
Description
SURGE SUPP 275V BIDIR DO-214AA
Manufacturer
Bourns Inc.
Datasheets

Specifications of TISP4350L3BJR

Package / Case
DO-214AA, SMB
Voltage - Breakover
350V
Voltage - Off State
275V
Voltage - On State
3V
Current - Hold (ih)
120mA
Number Of Elements
1
Capacitance
30pF
Breakover Current Ibo Max
13 A
Rated Repetitive Off-state Voltage Vdrm
275 V
Off-state Leakage Current @ Vdrm Idrm
0.005 mA
Forward Voltage Drop
3 V
Mounting Style
SMD/SMT
Current - Peak Pulse (8 X 20µs)
-
Current - Peak Pulse (10 X 1000µs)
-
Lead Free Status / RoHS Status
Lead free / RoHS Compliant

Available stocks

Company
Part Number
Manufacturer
Quantity
Price
Part Number:
TISP4350L3BJR
Manufacturer:
BOURNS
Quantity:
240 000
AUGUST 1999 - REVISED JANUARY 2007
Specifications are subject to change without notice.
Customers should verify actual device performance in their specific applications.
TISP4xxxL3BJ Overvoltage Protector Series
Pass criteria
No cheesecloth charring
Insulation OK
Wiring simulator (fuse) OK
I
2
NOTES
† ) Overcurrent protector I t must be lower than any other equipment element which carries the same current.
‡ ) UL accepts that a fuse with a 1 A or less rating meets the 1.3 A criterion.
§ ) Pass for 120 V a.c. between telecommunication line and ground current < 10 mA.
¶ ) Test 2 not required if the equipment d.c. breaking is 1.3 A or less, see comment ‡).
# ) Tests 3 and 4 not required for equipment with less than 1000 m of outside cable.
t < 100 A
parameters
Equipment
limiting ‡ )
to outside
enclosure
Connects
@ 600 V
100 A
cable
Has
Has
Has
Yes
Yes
d.c.
Yes
1.3 A
fire
IT
† )
2
2
s @ 600 V a.c.
s
Test 2. ¶ )
600 V, 7 A, 5 s
Test 3. # )
600 V, 2.2 A,
30 min or open circuit (3A)
Test 3A. # )
600 V, <3.3 A, 30 min, no
open circuit
Test 4. # )
< Limiting voltage, <2.2 A,
30 min, no open circuit, no
overvoltage protector
voltage limiting
A
B
C
D
Clause 6.4 — Protection against overvoltage from power line crosses
2
Figure 3. UL 60950 Power Cross Flow Chart
No
No
No
Test 1
APPLICATIONS INFORMATION
Annex NAC (normative) — Power line crosses
Telecommunication network connection
Figure 6C — Overvoltage flowchart
Test 2
Pass test 2
ground/line
pass tests
Pass 6.3.3
separation
enclosure
Has min.
spacings
supplied
26 AWG
Has fire
cord
and
3, 4
Yes
Yes
No
§ )
UL 60950 (12/2000)
No
Yes
Test 3
Test 1.
600 V, 40 A ,
1.5 s
E
G
H
F
No
No
Yes
Yes
Test 3A
Pass Test 1
Pass test 5
Yes
Test 4
No
J
I
Test 5.
120 V, 25 A ,
30 min or
open circuit
No
Test 5
Yes
No overvoltage
Users must verify
requirements
against latest issue
of UL 60950
testing
AIUL60950A
Pass
Fail
No

Related parts for TISP4350L3BJR